Check the appropriate box to designate the rule pursuant to which this Schedule is filed:
Checkbox not checked   Rule 13d-1(b)
Checkbox not checked   Rule 13d-1(c)
Checkbox checked   Rule 13d-1(d)






SCHEDULE 13G





SCHEDULE 13G





SCHEDULE 13G





SCHEDULE 13G



 
Pacific Century Oil and Gas Technology Co., LTD
 
Signature:/s/ Yali Wang
Name/Title:Yali Wang/Director
Date:06/17/2025
 
Yali Wang
 
Signature:/s/ Yali Wang
Name/Title:Yali Wang
Date:06/17/2025
 
Xiangteng Li
 
Signature:/s/ Xiangteng Li
Name/Title:Xiangteng Li
Date:06/17/2025